HERO CANAL TO OAKVILLE PUMP STATION
HERO CANAL TO OAKVILLE
PUMP STATION
-
Plaquemines Parish, Louisiana
-
Construction Management Services
K-Belle partnered with Meyer Engineers, Ltd. is completing
construction management and quality assurance oversight on the $26.5M Hero Canal to Oakville Pump Station project. Work includes hydraulic structures such as pump station construction, stop-log closure structure, floodwalls, levees, navigation structures such as drainage canals and pre-stressed concrete piles. Additionally, marine structures were included such as bulkheads, dolphins, fenders, guide walls, and jetties. The pump station includes two 35 CFS submersible pumps and discharge piping. The navigational stop-log structure includes a reinforced concrete 56’ bulkhead closure structure, bulkhead closure gates (2); a bulkhead storage platform for the housing of the bulkhead gates; and a hydraulic pedestal-mounted crane and crane platform.
Architect: N/A
Year of Completion: 2012
Project Cost: $26.5M